About 2020 "Itoman-shi house reform support project"

July 6, 2020

  In Itoman-shi of improvement of quality of the residence environment and empty house assist of expense of house reform construction that self lives in to plan effectively utilizing.

(1) Application start
 Offer (going to publish in ※ wide July issue to repay, and not to be rich) occasional by reception desk order the first from Monday, July 13, 2020
 ※But we finish acceptance as soon as budget disappears

(2) Supporting eligible people
 ・Person who it is made resident registration, and, in fact, lives in Itoman-shi
 ・Person who is going to live in target house which completed construction
 ・Person who is not behind with city taxes

(3) Target house
 It is the following in house in Itoman-shi
 ・House (after the building, it passes more than one year) owned by self
 ・Empty house (state that there is not living person passes more than one year) owned by self
 ・Rented house, empty house of rented house or apartment house (but we need permission of owner)

(4) Target construction
 ・Being repair work to improve barrier-free repair work and energy saving repair work, repair work of empty house, the durability of house to affect house   
 ・Total construction cost 200,000 yen or more things (including sum of consumption tax and local consumption tax)
 ・Construction completion and the results report being possible by February 26, 2021 (when it is past time limit, we cannot issue subsidy)

 ※Contract with supplier and thing which constructs, and starts are excluded before grant application, grant decision

(5) Construction supplier
 ・Individual company which has the head office, corporation with branches or the city office in the city, and makes resident registration in Motoichi

(6) Sum of subsidy
 ・40% of construction costs that repair work to correspond to barrier-free applies (but supporting limit 200,000 yen)
 ・20% of construction costs that repair work to correspond to improvement such as energy saving, empty house, the durability of house applies (but supporting limit 200,000 yen)

(7) Flows from application to subsidy grant
 1. We prepare documents necessary for grant application.
            yajirushi.png
 2. We submit subsidy grant application to city hall.
            yajirushi.png
 3. We receive subsidy grant decision notification from city hall.
            yajirushi.png
 4. We contract with supplier and start by construction.
            yajirushi.png
 5. After the construction completion, we submit subsidy results report to city hall.
            yajirushi.png
 6. We receive subsidy grant decision notification from city hall.
            yajirushi.png
 7. We demand subsidy from city hall.
            yajirushi.png
 8. Subsidy is issued by city hall.
 ※ The details, please take "flows from application to subsidy grant" of the lower page into account.

○Supporting target barrier-free repair work
 (1) Widening of passages
 (2) Relaxation of incline of stairs
 (3) Bathroom improvement
 (4) Rest room improvement
 (5) Installation of handrail
 (6) Cancellation of step
 (7) Improvement of door of doorway
 (8) Exchange to grippy flooring charges
 (9) Repair work to accept saying that other mayors contribute to barrier-free

○Supporting target energy saving repair work
 (1) Insulation construction of window
 (2) Insulation construction of floor
 (3) Roof, insulation construction of ceiling
 (4) Insulation construction of wall
 (5) Repair work to accept saying that other mayors contribute to energy saving

○Supporting target empty house repair work
 (1) Construction to change layout in existing dwelling unit of
 (2) Repair of kitchen, bathroom, washroom or rest room
 (3) Repair of water supply and drainage, electricity or gas fitting
 (4) Repair of exterior such as roof, outer wall
 (5) Other mayors are repair work to accept saying that we contribute to effectively utilizing of empty house

○Repair work to improve the durability of house
 (1) Pillar, the removal of concrete which exfoliated of main structure part such as beams or repair
 (2) Eaves, the removal of concrete which exfoliated of part that is at great risk of having dropped of in the ceiling or repair
 (3) Repair with pillar, rigidity of junction of beam as hardware to raise
 (4) Pillar, beam, wall, strut or basic reinforcement
 (5) Reinforcement of floor by plywood for striking sparks beam or structure
 (6) Reinforcement of brace or wall surface with steel sheet wall
 (7) Additional construction of buckling stopper
 (8) The removal of the roof tank which became nonuse
 (9) Reinforcement of room offering long time such as living room, bedroom for one of the residence
 (10) Repair work to accept saying that other mayors contribute to durable improvement

[supporting sum calculation example of target construction]
Construction cost 400,000 yen (in the case of construction to correspond to barrier-free) that is targeted for  example 1
   400,000 yen X 0.4 (40%) = 160,000 yen
 Construction cost 400,000 yen (in the case of construction to correspond to improvement such as energy saving, empty house, the durability of house) that is targeted for example 2
   400,000 yen X 0.2 (20%) = 80,000 yen
 Construction cost 1.2 million yen (in the case of construction to correspond to barrier-free) that is targeted for example 3
   1.2 million yen X 0.4 (40%) = 480,000 yen
   ※Amount of furtherance (there is ceiling) 200,000 yen
 Construction cost 1.2 million yen (in the case of construction to correspond to improvement such as energy saving, empty house, the durability of house) that is targeted for example 4
   1.2 million yen X 0.2 (20%) = 240,000 yen
   ※Amount of furtherance (there is ceiling) 200,000 yen
 Construction cost 180,000 yen that is targeted for example 5
   ※As it is less than target construction cost 200,000 yen, assistance is inapplicable.  

 

[corresponding file link]
◇ House reform support project summary

2020 house reform support project summary (108KBytes)

 

◇ One set of house reform support project style

2020 house reform support project style. pdf(561KBytes)

2020 house reform support project style (309KBytes)

◇ House reform support project style mention example

2020 house reform support project style mention example. pdf(786KBytes)

◇ Flows from application to subsidy grant
Flow (40.1KBytes) from application to subsidy grant

◇ House reform support project grant application check table
House reform support project grant application check table. pdf(78.8KBytes)

◇House reform support project results report check table

House reform support project results report check table. pdf(44.0KBytes)

◇ Construction list targeted for house reform support project

Construction list (60.3KBytes) targeted for house reform support project

◇ House reform support project Q&A

House reform support project Q & A.pdf(71.8KBytes)

 

Word concerned

Contact

Construction section
Person in charge of municipal house
Telephone: 098-840-8138
Facsimile: 098-992-5408